The bow megablock for Scillonian IV is now structurally complete and has been relocated to the head of the dock. Moving it away from the main construction and painting areas keeps them cleaner, ready for the blasting and painting of the megablock to take place.
Meanwhile, rigorous hose testing is underway on Menawethan’s watertight doors. A jet of water is directed over the door seals and windows to confirm they are watertight and the structure unaffected by the heat of welding, with inspectors checking from inside to ensure every seal holds firm.
The vessel’s doors are fitted with a “common dog” system, meaning a single lever operates all securing points at once, adding both safety and efficiency.